Description: 

The Science and Engineering 2 Building Project is an assignable 58,000 net square feet and 102,000 gross square feet building. The building is comprised of a basement, ground floor, second floor and third floor. The structure is steel frame with precast concrete columns at the perimeter. It is Type 2A construction and is fully sprinklered. The University of California Merced campus is targeting the project for LEED Platinum certification. The building houses Mechanical Engineering, Bio-Engineering, Material Science Engineering, Environmental Engineering, Computer Science Engineering, Teaching Classrooms, Imaging Suite, NMR’s, Wind Tunnel Lab, faculty offices and administrative spaces.
The Project will be constructed using Multiple Prime Trade Contractors, each working under a separate contract with the University. This procurement is for prime contracts to perform the various bid packages of the project as listed below. A contractor who is awarded a contract will be referred to as a “Prime Trade Contractor”. The University has waived all prior prequalification requirements for this Project.

Status: