Classroom & Academic Office Building (CAO) CM/Contractor Prequalification Revision 1 - Resubmission
You are here
HomePosted
Jan. 23, 2013
Submittal Deadline
Feb. 14, 2013 - 4:00pm
Job Walk/Pre-Bid Conference
Feb. 20, 2013 - 10:00am
Category
Project/Bid Number
900290
Mandatory
Results
Description
Level 1 Prequalification Questionnaire documents.
The Classroom and Academic Office Building (CAOB) at UC Merced is a new approximately 51,000 ASF and 77,000 OGSF building with 104,000 square foot site development. This is proposed to be a three story, Type II, B construction, non-rated, fully sprinklered building. The building will house 120-seat, 150-seat and 210-feet sloped floor lecture halls, two 90-seat flat floor lecture halls, classrooms, dry laboratories, offices and other support spaces.
Document
Status